Standard Contractor Estimate & Scope Proposal Worksheet

Fill in your job scope, line-item pricing, and Good-Better-Best package options right in your browser, or load into the Markup vs. Margin Quote Builder.

Document Code: TBH-EST-101 (Editable in Browser)
Open in Interactive Calculator
CONTRACTOR ESTIMATE & SCOPE OF WORK PROPOSAL
Project: Primary Bathroom Tile Shower & Vanity Remodel
Client / Owner: Thompson Residence — 412 Maple Ave
Contractor: Your Contracting Company LLC • License #884120
Ref: TBH-EST-101
Date: 2026-11-20
Click any text or cell below to edit before printing
Editable Line-Item Scope & Pricing Schedule (Click Any Cell to Customize)
Line Item / Phase Scope Description & Specifications Qty / % Unit Rate / Scheduled Line Total
01. Demo & Site Protection Ram Board floor protection, dust barrier, demo existing tub surround & vanity, haul debris 1 LS $1,850.00 $1,850.00
02. Rough Plumbing & Shower Valve Install new pressure-balanced mixing valve, relocate 2" shower drain, pressure test 1 LS $2,140.00 $2,140.00
03. Waterproofing & Tile Shower Surround 1/2" cement board + liquid membrane waterproofing + porcelain wall/floor tile up to ceiling 115 SF $48.00/SF $5,520.00
04. 60" Double Vanity, Quartz Top & Trim Set solid-wood vanity cabinet, undermount bowls, faucets, GFCI circuit, and LED mirror 1 LS $4,390.00 $4,390.00
05. Frameless 3/8" Tempered Glass & Paint Custom heavy glass enclosure + 2 coats moisture-resistant satin enamel on walls/ceiling 1 LS $2,950.00 $2,950.00

Contract Terms, Notes & Payment Schedule

  • Payment Draw Schedule: 30% Deposit upon contract signing ($5,055.00), 40% upon rough-in & waterproofing inspection ($6,740.00), 30% upon substantial completion ($5,055.00).
  • Proposal Validity: Prices quoted are guaranteed for 30 calendar days from proposal date. Hidden structural rot, mold, or code violations behind walls will be priced via written Change Order prior to proceeding.
  • Workmanship Warranty: Contractor provides a 2-year written labor warranty in addition to all manufacturer material warranties.
Option A — Standard Base Scope Total $16,850.00
Option B — Better Package (+ Heated Tile Floor & Niche) $19,400.00
Option C — Best Package (+ Curbless Entry & Rain Head) $22,350.00
CLIENT / OWNER / GC ACCEPTANCE

The above prices, specifications, and conditions are satisfactory and are hereby accepted. Contractor is authorized to perform the work as specified.

Authorized Client Signature & Date
CONTRACTOR AUTHORIZED REPRESENTATIVE

Prepared and submitted in good faith based on visible site conditions and stated specifications.

Contractor Signature, Title & Date

Estimator Checklist Before Printing or Sending This Form

  • Verify your total job price uses Gross Margin division [Cost ÷ (1 − Margin%)] rather than simple markup.
  • List explicit exclusions (e.g., structural engineering, asbestos abatement, or permit fee pass-throughs) so scope boundaries are crystal clear.
  • Include a milestone payment draw schedule tied to physical inspection stages rather than vague calendar dates.
Want Automatic Math & Live Margin Checks?

Load this exact worksheet preset inside our interactive calculator to adjust crew hours, taxes, or retainage percentages automatically.

Open in Interactive Calculator →

Frequently Asked Questions

Should I show individual material and labor hours on a customer estimate?

For fixed-price residential and light commercial bids, show clear scope phases (e.g., Demo, Rough-In, Tile Installation, Finish Trim) with a lump-sum price per phase rather than exposing your raw hourly wage and material receipts. That gives the customer full clarity on what is included without inviting line-by-line hardware-store haggling.

What is the safest deposit percentage for a contractor estimate?

A 25% to 35% deposit upon signing covers upfront material orders and locks in the schedule. Be sure to check your state home-improvement law—for example, California caps upfront down payments on residential home improvement at 10% or $1,000 (whichever is less) before work starts.