Progress Billing & Retainage Pay-App Worksheet (AIA G702 / G703 Style PDF)

Fill out your line-item Schedule of Values, calculate current draw amounts and retainage withheld, and print a clean 2-page payment application in one click.

Load Sample Job:

1. Application Header & Retainage Rules (G702 Cover Data)

2. Schedule of Values Continuation Table (G703 Style)

Line-Item Schedule of Values (Columns A through I)
A. Item B. Description of Work C. Scheduled Value ($) D. Previous Apps ($) E. Work This Period ($) F. Stored Mat. ($) G. Total to Date ($) H. % / Balance I. Retainage ($) Del
$12,000.00 100.0% ($0) $1,200.00
$45,000.00 100.0% ($0) $4,500.00
$28,000.00 100.0% ($0) $2,800.00
$44,000.00 84.6% ($8,000) $4,400.00
$18,500.00 54.4% ($15,500) $1,850.00
$0.00 0.0% ($24,000) $0.00
SCHEDULE OF VALUES TOTALS $195,000.00 $86,500.00 $50,500.00 $10,500.00 $147,500.00 75.6% ($47,500) $14,750.00

3. Application & Certificate for Payment Summary (G702 Cover Sheet)

Contract Sum to Date (Line 3)
$203,500.00
Original + Approved COs
Total Completed & Stored (Line 4)
$147,500.00
75.6% of Base SOV Complete
Total Retainage Held (Line 5)
$14,750.00
Held in Owner/GC Reserve
Net Current Payment Due (Line 8)
$54,900.00
Balance w/ Retainage: $70,750.00
Standard 9-Line Application for Payment Certification Summary
1. ORIGINAL CONTRACT SUM (Sum of Column C Scheduled Values) $195,000.00
2. Net Change by Approved Change Orders $8,500.00
3. CONTRACT SUM TO DATE (Line 1 ± Line 2) $203,500.00
4. TOTAL COMPLETED & STORED TO DATE (Column G Total on G703) $147,500.00
5. RETAINAGE (Total of Column I on G703 Continuation Sheet) −$14,750.00
6. TOTAL EARNED LESS RETAINAGE (Line 4 Less Line 5) $132,750.00
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Prior Net Approved Draws) −$77,850.00
8. CURRENT PAYMENT DUE THIS APPLICATION (Line 6 Less Line 7) $54,900.00
9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 Less Line 6) $70,750.00
CONTRACTOR’S CERTIFICATION

The undersigned Contractor certifies that to the best of the Contractor’s knowledge, the Work covered by this Application has been completed in accordance with the Contract Documents and that current payment shown herein is now due.

Authorized Contractor Signature & Date
OWNER / ARCHITECT / GC CERTIFICATE FOR PAYMENT

In accordance with the Contract Documents, based on on-site observations and the data comprising this application, the Owner/GC certifies that the Work has progressed as indicated and Applicant is entitled to payment of the Amount Certified.

Approved By (PM / Architect / Owner) & Date

How This Calculator Works (Step-by-Step Formula)

  1. Enter your project details, Application Number, retainage percentages for completed work and stored materials (typically 5% or 10%), and any approved Change Order totals.
  2. Fill in each line of your Schedule of Values (Column C: Scheduled Value, Column D: Work Completed from Previous Applications, Column E: Work Completed This Period, and Column F: Materials Presently Stored).
  3. The calculator automatically computes Total Completed and Stored to Date (Column G = D + E + F), Percentage Complete (G ÷ C), Balance to Finish (C − G), and Variable Retainage (Column I) on every line.
  4. Review the G702-style Application Summary block—which subtracts Total Retainage and Previous Certificates Paid to arrive at your exact Current Payment Due—then click Print / Save PDF.

How Retainage and Progress Draws Work on a $200,000 Subcontract

A drywall subcontractor has a $200,000 base contract with 10% retainage. On Pay App #1 they billed $60,000 of work (receiving $54,000 net after $6,000 retainage). On Pay App #2 they complete another $50,000 of work and store $10,000 of verified materials on site.

Worked Job-Costing Breakdown
Cost / Billing Line Item Formula / Basis Dollar / Hour Result
1. Original Contract Sum (+ $0 Change Orders) Base Schedule of Values total $200,000.00
2. Total Completed & Stored to Date (Col G) $60,000 prev + $50,000 current + $10,000 stored $120,000.00
3. Retainage Held to Date (10% of Col G) 10% × $120,000 total completed & stored $12,000.00
4. Total Earned Less Retainage $120,000.00 − $12,000.00 $108,000.00
5. Less Previous Certificates for Payment Net paid on Pay Application #1 $54,000.00
6. Current Payment Due (Pay App #2) $108,000.00 − $54,000.00 $54,000.00
7. Balance to Finish, Including Retainage $200,000.00 − $108,000.00 earned net $92,000.00

Key Field Takeaway: Over 80% of rejected subcontractor pay apps fail because Column G + Balance to Finish does not match the Contract Sum or because previous gross billings are subtracted instead of previous net certificates.

Frequently Asked Questions

Can I use this G702 / G703 style worksheet for commercial GCs without buying software?

Yes. While some contracts specifically mandate purchasing copyrighted AIA® paper forms, most commercial general contractors, lenders, and property owners accept standard G702/G703-formatted Schedule of Values spreadsheets and PDFs as long as the 9 columns, retainage math, and notarized/signed certification block match.

What is the difference between Previous Applications (Column D) and Less Previous Certificates for Payment?

Column D on the continuation sheet is the GROSS dollar amount of work completed on prior pay apps before retainage was taken out. "Less Previous Certificates for Payment" on the cover summary is the NET dollar amount already certified/paid after retainage was subtracted.

How do I handle retainage reduction from 10% to 5% at 50% completion?

Simply change the Retainage % on Completed Work input from 10% to 5% (or 7.5% blended if your contract only reduces retainage on the second half of the job). The calculator updates Total Retainage Held to Date and releases the excess into your Current Payment Due.